Paste-360 Rotating Wellhead

Globally Patented

PASTE-360 is our flagship product. It is globally patented in Australia, United States of America, Brazil, Africa (African Regional IPO), Europe, Indonesia, Hong Kong & Chile, with several other countries in the final stages of approval.

One of the biggest problems our clients report is casing and tubing wear. Even thick-walled steel can wear enough over time to fail, and because wear rates are unpredictable and hard to measure, that failure often strikes without warning — causing significant unplanned downtime, and in cement operations, the risk of cement filling the annulus and requiring a full re-drill. In 2019, Allegiant designed PASTE-360 — a rotatable wellhead system built to complement our casing range with enhanced production capacity. After prototyping and testing, we patented the design internationally and released it for trial in 2020 alongside our rotating centralisers. PASTE-360 significantly extends casing life on vertical or inclined, new or existing wells, and — combined with our bottom of well assembly — lets operators monitor annulus pressure changes and act immediately, reducing downtime and avoiding costly grouting or re-drilling.

  • Rotates the production liner in small increments for a more even spread of wear
  • Increases asset life
  • Facilitates flushing of the annulus on the outside of the production liner
  • Ability to monitor pressure changes
  • Major wear components lined with durable Ceramic Composite Lining
  • Fully serviceable
  • Safe, efficient and cost-effective method of reducing wear-related issues
  • Reduces unplanned downtime and increases production time

Orange PASTE-360 rotating wellhead installed on inclined casing beside a concrete slab at a mine site

We believe unpredictable wear shouldn't decide when your well fails. Our patented PASTE-360 rotates the production liner to spread wear evenly, extending casing life on any vertical or inclined well.

Case Study

Northern Star Resources — Thunderbox

Key project stats

7.9×
increase in pastefill casing longevity
More than $2.1 million
in avoided casing replacement, workover and re-drilling costs in the first 12 months
2 wellheads
installed across 2 pastefill boreholes
5 stars
for communication, service and product offering in a 2025 client survey

Project Overview

Northern Star Resources' Thunderbox underground gold mine in Western Australia relies on pastefill delivered through cased boreholes. Allegiant Solutions supplied and installed PASTE-360 rotating wellheads, site-specific adaptors and ongoing support to help extend casing life and improve visibility of borehole condition.

The Problem

Abrasive paste wore unevenly against the lower side of the casing, leaving it vulnerable to failure while much of the remaining wall was still sound. A breach could interrupt paste delivery and trigger costly casing replacement, well workovers or re-drilling.

The Solution

PASTE-360 rotates the production liner in small increments, distributing wear around its circumference. Flushing ports and annulus pressure monitoring support maintenance and breach detection, while replaceable ceramic composite wear liners simplify servicing. Allegiant supplied crossovers and adaptors to suit Thunderbox's existing casing and supported installation, upgrades and ongoing maintenance.

The Outcome

At Thunderbox, casing longevity increased 7.9 times, with more than $2.1 million in avoided replacement, workover and re-drilling costs in the first 12 months. Wellhead monitoring gives the site earlier visibility of casing breaches, helping its team respond before failures disrupt pastefill operations.